
ALAC Advice to the ICANN Board on Subsequent Procedures

Statut
- Phase 1. Élaboration de la première version préliminaire
Fini: 26 mar. 2021
- Phase 2. Ouvert à la consultation publique
Fini: 7 avr. 2021
- Phase 3. Finalisation de la version préliminaire finale
Fini: 13 avr. 2021
- Phase 4. Vote de l'ALAC
Fini: 16 avr. 2021
- Phase 5. Soumission
Envoyé: 16 avr. 2021
Soumettre une déclaration
Échéance de la soumission: 16 avr. 2021 23:59 UTC
Contexte
Following the submission of an ALAC Statement to and for inclusion to the New gTLD Subsequent Procedures PDP Final Report, the ALAC also resolves to issue ALAC Advice to the ICANN Board of Directors in respect of the recommendations contained in that Final Report. Refer to: At-Large Workspace: ALAC Advice to the ICANN Board on Subsequent ProceduresOpens a new windowOpens a new window At-Large Workspace: ALAC Statement for SubPro PDP Final ReportOpens a new windowOpens a new window At-Large Workspace: SubPro UpdatesOpens a new windowOpens a new window

Alac Advice

