
ALAC Advice to the ICANN Board on Subsequent Procedures

Estado
- Phase 1. Elaboración primer borrador
Finalizó: 26 mar 2021
- Phase 2. Apertura para recepción de comentarios
Finalizó: 7 abr 2021
- Phase 3. Finalizar primer borrador
Finalizó: 13 abr 2021
- Phase 4. Votación del ALAC
Finalizó: 16 abr 2021
- Phase 5. Presentación
Presentado: 16 abr 2021
Presentación de una declaración
Plazo de presentación: 16 abr 2021 23:59 UTC
Antecedentes
Following the submission of an ALAC Statement to and for inclusion to the New gTLD Subsequent Procedures PDP Final Report, the ALAC also resolves to issue ALAC Advice to the ICANN Board of Directors in respect of the recommendations contained in that Final Report. Refer to: At-Large Workspace: ALAC Advice to the ICANN Board on Subsequent ProceduresOpens a new windowOpens a new window At-Large Workspace: ALAC Statement for SubPro PDP Final ReportOpens a new windowOpens a new window At-Large Workspace: SubPro UpdatesOpens a new windowOpens a new window

Alac Advice

